BCC meeting tomorrow:
33.19-0328 - Pdf
Request approval to schedule a Special Meeting for the South Walton Connector Road PD&E Study presentation and update in August
HISTORY: August 11, 2015-BCC approved to request Atkins to begin updating the Study and to bring a Scope of Work and Cost Estimate to the Board. February 9, 2016-BCC approved Task order No. 16-01 with Atkins Engineering. December 13, 2016-BCC approved the Atkins Engineering 30A Traffic Study. February 14, 2017-BCC approved to look at Alternate 4 and to look at the east boundary. February 13, 2018-BCC approved for staff to develop an RFQ for the PD&E Study (least impactful method to alleviate traffic on 30A) and bring back to the BCC for approval to advertise. March 13, 2018-BCC approved the SCOP of Services for CR 30A PD&E Study and to advertise an RFQ as presented. May 17, 2018-RFQ 018-027 closed. June 28, 2018- BCC awarded RFQ 018-027 PD&E Services for SW Connector Roads and approved to begin negotiations. August 28, 2018-BCC approved to advertise and hold a public hearing to recognize $597,750.00 from the Proportionate Fair Share fund for the professional design & engineering services for the South Walton Connector Road 30A & Hwy 98. September 11, 2018-BCC approved Contract No. 018-027 PD&E Services for South Walton Connector Road with Atkins North America, Inc. in the amount of $597,780.00. BCC approved a Resolution to recognize Proportionate Fair Share Fund in the amount of $597,780.00 for the professional design and engineering services for the South Walton Connector Road from 30A to Hwy 98.