Upgrade and improvement of the intersection of CR395 and US Hwy 98. The intersection improvements generally include the widening of the northbound and southbound approaches to include additional laneage.
The northbound approach will add a designated left turn lane and the southbound approach will add a designated right turn lane and striped median.
Other improvements include the extension of existing side drains cross CR395; milling and resurfacing of existing pavement; and traffic signal modifications consisting of one (1) signal head replacement, one (1) signal head relocation, pull box relocations, traffic loop replacement, and wiring.
Bid request info:
http://www.co.walton.fl.us/Bids.aspx?bidID=254
The northbound approach will add a designated left turn lane and the southbound approach will add a designated right turn lane and striped median.
Other improvements include the extension of existing side drains cross CR395; milling and resurfacing of existing pavement; and traffic signal modifications consisting of one (1) signal head replacement, one (1) signal head relocation, pull box relocations, traffic loop replacement, and wiring.
Bid request info:
http://www.co.walton.fl.us/Bids.aspx?bidID=254