The Driftwood Road Municipal Parking Facility project is on a 1.25-acre parcel located at 76 Driftwood Rd. in Miramar Beach. Plans include 82 parking spaces — with dedicated parking for ADA, LSV and bicycles — and an air-conditioned public transit stop with a restroom facility. [B][I]STATUS: [/I][/B]The project is expected to be completed this winter. This project is adjacent the relatively new Miramar Beach Regional Access [URL unfurl="true"]https://sowal.com/place/miramar-beach-regional-access[/URL] [ATTACH type="full" alt="Driftwood_Road_Exfiltration_Installation_8.14.26.JPG"]111746[/ATTACH]