My apologies if this has been discussed in another thread recently, but my search didn't show anything. With all of the talk lately about infrastructure spending and allocations going to "shovel-ready" projects, I was curious what was the last official statement about when/if any funding would be sought for the new 331 bridge. What "shovel-ready" projects are in the area, and who decides what projects meet that term?
Replies
112Admin
It is being pushed hard. http://www.waltoncountychamber.com/pdf/Highway_331.pdf
Looking for $480 Million.
More info - NFTCA
Looking for $480 Million.
More info - NFTCA
Beach ComberAuthor
$480,000,000
.
After reading the bridge portion on the walton county chamber link, it sounded to me like a $5,000,000 request was submitted to support additional study of the bridge design and that no state or local funds are available to support a project of this magnitude. If that is right, this doesn't really sound like a "shovel-ready" project (whatever that means) since it still seems to be in the design phase. Actually, I read in one article that "shovel-ready" meant work could begin within 120 days of receiving funding. However, the definition of "work" is also probably open to interpretation.
I live out of state and haven't read local reports about specific possibilities in Florida for the stimulus cash. Does anyone think the viability or timeline of the proposed bridge will be improved by the stimulus bill? If not, does anyone have any ideas of what impact on regional infrastructure might happen because of the stimulus package?
. After reading the bridge portion on the walton county chamber link, it sounded to me like a $5,000,000 request was submitted to support additional study of the bridge design and that no state or local funds are available to support a project of this magnitude. If that is right, this doesn't really sound like a "shovel-ready" project (whatever that means) since it still seems to be in the design phase. Actually, I read in one article that "shovel-ready" meant work could begin within 120 days of receiving funding. However, the definition of "work" is also probably open to interpretation.
I live out of state and haven't read local reports about specific possibilities in Florida for the stimulus cash. Does anyone think the viability or timeline of the proposed bridge will be improved by the stimulus bill? If not, does anyone have any ideas of what impact on regional infrastructure might happen because of the stimulus package?
Edited
SWGB
The biggest hurdle to cross in getting bridge funding is getting past non-users of the bridge from terming it the "bridge to nowhere". While everyone who lives, works, or vacations here knows and can see or experience the need of a 4 lane bridge those who don't will see this as waste. Throw in the fact that while not vocally opposed, it's almost a guarantee that the Mid-bay Bridge authority is very opposed to this non-revenue generating project unless it can be bonded and then placed under their management. Their are many entities at work with this bridge and time will reveal those that have good, bad, or purely monetary motives.
Beach Fanatic
This is from the WZEP email news:
"
[SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][B]Economic Stimulus Could Mean New Bridge[/B][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE]
[SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2] [/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2] [/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE]
[SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2] [/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2]Is a sister bridge to the Clyde B. Wells Bridge closer than you think. As the economic stimulus package approval is starting to develop, Walton County could see money for the shovel ready $336 million bridge.[/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE]
[SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2] [/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2] [/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE]
[SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2] [/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2]Shovel ready is a term meaning a project is ready to begin the design and build. When District 3 Secretary Kelly last visited with the commissioners, he said the second bay bridge is a project they could let out in a matter of days to a company who would design and build the second two lanes. Kelly said the bridge would be a shore to shore bridge after the FDOT looked at using the existing causeway and decided it would take more to shore it up than it would to build without using it.[/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE]
[SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2] [/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2] [/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE]
[SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2] [/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2]The second bridge is needed for current traffic and to help empty out the south end of the county in an emergency situation. U.S. 331 is the only north south road out of south Walton. The FDOT currently has the portion south of the bridge under construction as a four lane project. The four lanes would simply empty into the existing two lanes of the bridge, creating bottlenecks. Walton has been seeking a widened U.S. 331 for around 30 years and only now is seeing some sections getting the updates. Walton County is also working with the state on a public private partnership to add additional lanes to the section north of Owls Head to Edgewood Circle in Woodlawn.[/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE]
[SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2] [/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2] [/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE]
[SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2] [/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2]According to an article in the Pensacola News Journal, Secretary Kelley said at an FDOT teleconference Friday morning that he expects about $100 million in stimulus funding for District 3 counties. How that would be broken up is still being discussed. FDOT spokesman Tommie Speights says this is all preliminary, and once the numbers are out, then they can say how much each county will get.[/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE]
[SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2] [/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2] [/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE]
[SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2] [/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2]While the stimulus package has proponents and opponents, many do agree by putting the money into construction jobs, especially updating the countrys aging infrastructure, the economy will see a greater return than when money was sent directly to the taxpayers.[/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE]
[SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2] [/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2] [/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE]
[SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2]The state of Florida is also looking at how to help the local economy and has plans to move up some projects. These include projects like resurfacing Highway 90, something in the plans, but potentially advanced by the state."[/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE]
"
[SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][B]Economic Stimulus Could Mean New Bridge[/B][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE]
[SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2] [/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2] [/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE]
[SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2] [/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2]Is a sister bridge to the Clyde B. Wells Bridge closer than you think. As the economic stimulus package approval is starting to develop, Walton County could see money for the shovel ready $336 million bridge.[/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE]
[SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2] [/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2] [/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE]
[SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2] [/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2]Shovel ready is a term meaning a project is ready to begin the design and build. When District 3 Secretary Kelly last visited with the commissioners, he said the second bay bridge is a project they could let out in a matter of days to a company who would design and build the second two lanes. Kelly said the bridge would be a shore to shore bridge after the FDOT looked at using the existing causeway and decided it would take more to shore it up than it would to build without using it.[/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE]
[SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2] [/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2] [/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE]
[SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2] [/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2]The second bridge is needed for current traffic and to help empty out the south end of the county in an emergency situation. U.S. 331 is the only north south road out of south Walton. The FDOT currently has the portion south of the bridge under construction as a four lane project. The four lanes would simply empty into the existing two lanes of the bridge, creating bottlenecks. Walton has been seeking a widened U.S. 331 for around 30 years and only now is seeing some sections getting the updates. Walton County is also working with the state on a public private partnership to add additional lanes to the section north of Owls Head to Edgewood Circle in Woodlawn.[/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE]
[SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2] [/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2] [/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE]
[SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2] [/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2]According to an article in the Pensacola News Journal, Secretary Kelley said at an FDOT teleconference Friday morning that he expects about $100 million in stimulus funding for District 3 counties. How that would be broken up is still being discussed. FDOT spokesman Tommie Speights says this is all preliminary, and once the numbers are out, then they can say how much each county will get.[/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE]
[SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2] [/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2] [/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE]
[SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2] [/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2]While the stimulus package has proponents and opponents, many do agree by putting the money into construction jobs, especially updating the countrys aging infrastructure, the economy will see a greater return than when money was sent directly to the taxpayers.[/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE]
[SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2] [/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2] [/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE]
[SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2][SIZE=2]The state of Florida is also looking at how to help the local economy and has plans to move up some projects. These include projects like resurfacing Highway 90, something in the plans, but potentially advanced by the state."[/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE][/SIZE]
Beach Fanatic
I deleted my earlier post outlining why I thought the stimulus monies would not be going toward the bridge expansion after the e-blast from WZEP, but upon reflection, I can't see how the numbers work. In the link posted by Kurt, it states that the overall cost of the project is estimated at $480 million. In the e-blast it says that $100 million would be allocated to all counties in District 3, not each County and the breakdown has yet to be determined. I see two problems with the story.
Even if the bridge project alone can be done as a design build, how can it be done at less than $100 million (when they state it will cost $336M or $480M depending on the source).
Second, how is the County going to get the entire District's allocation. Am I missing something as to the cost of the bridge and a realistic allocation of the District's dollars?
It appears that the e-blast is saying that it meets the criteria of an eligible project due to previous reports by the DOT (however the timeframe and context of those reports are not given) but the dollars still do not appear to be there.
Even if the bridge project alone can be done as a design build, how can it be done at less than $100 million (when they state it will cost $336M or $480M depending on the source).
Second, how is the County going to get the entire District's allocation. Am I missing something as to the cost of the bridge and a realistic allocation of the District's dollars?
It appears that the e-blast is saying that it meets the criteria of an eligible project due to previous reports by the DOT (however the timeframe and context of those reports are not given) but the dollars still do not appear to be there.
SoWal Expert
dollars are not there, beachsi02. you are correct. However, I think this project will become a user-fee project (aka - toll bridge), which may be able to fund the remainder through bonds.
Beach ComberAuthor
BeachSiO2, I agree with you that at first glance the numbers don't seem to work. For those who support the idea of the new bridge, it would be great to somehow have total funding for the project as a result of the stimulus infusion. However, even if only a smaller sum than actual estimates are allocated to the bridge, maybe it could act as a catalyst to secure other sources of funding. I have no idea what those sources might be
. Bake sales? Tolls as SJ said. It was disheartening to read in a prior post that Walton County has been seeking the widening of 331 for 30 years! This stimulus package heavy on infrastructure investment seems like it will truly be a rare opportunity, and I'm looking forward to seeing how it is allocated across the region. The tasks of deciding a priority list for projects and how to spend whatever amount is earmarked for the area don't seem to be enviable ones to me. I can only imagine all of the competing interests in play when trying to figure what are the best projects to fund. Someone probably better have a shovel ready because it will likely get deep in some closed door discussions. I'm sure that some of the money will likely be squandered (ie along the thoughts of not letting the perfect be the enemy..); it seems inevitable for something of this size. Whether or not all of us agree with the magnitude of the stimulus, at this point, I'm just hopeful that whatever portions head to Walton County and the surrounding region are used judiciously.
. Bake sales? Tolls as SJ said. It was disheartening to read in a prior post that Walton County has been seeking the widening of 331 for 30 years! This stimulus package heavy on infrastructure investment seems like it will truly be a rare opportunity, and I'm looking forward to seeing how it is allocated across the region. The tasks of deciding a priority list for projects and how to spend whatever amount is earmarked for the area don't seem to be enviable ones to me. I can only imagine all of the competing interests in play when trying to figure what are the best projects to fund. Someone probably better have a shovel ready because it will likely get deep in some closed door discussions. I'm sure that some of the money will likely be squandered (ie along the thoughts of not letting the perfect be the enemy..); it seems inevitable for something of this size. Whether or not all of us agree with the magnitude of the stimulus, at this point, I'm just hopeful that whatever portions head to Walton County and the surrounding region are used judiciously.SoWal Expert
the NWFTCA has already prioritized a list regarding roads for NW FL. It's on a chart on their website, along with costs, but note that it isn't necessarily linked to the money which may come to this area from the Not-So Stimulating Act.
Beach Fanatic
Sorry if I appear to be Debby Downer, but a firm I work with is currently working with a number of public clients in regards to the stimulus funding. The problems we are seeing is that a number of projects either don't meet the strictly defined criteria or do and yet funding still doesn't exist so we are having to temper expectations. I for one believe that the bridge definitely needs to be built.
Here is the current status of the relevant portion of the bill. First, there is a total of $29 Billion for the US that will be allocated to the categories of projects in which this bridge would fall. The two categories are:
1. National Surface Transportation System (competitive "grant" program) that will be allocated by the Federal DOT and thus NOT SUBJECT to the state ranking system (1.5 Billion). There are requirements but this money is to be split evenly between urban and rural areas. Applications due in 180 days, project finished in 3 years.
2. Federal Highway Administration- These funds will be routed through state DOT's and subject to their "lists" (27.5 Billion). This is where the money will come from that is discussed in the WZEP blast. Funds are to be apportioned in 120 days, project must be completed in 3 years. If after 120 days, funds are not apportioned, states will lose the money and it will go to another state that have expended their funds, "use it or lose it." Another sweep will occur at a year to ensure projects are progressing.
Although these are substantial amounts, I just don't see that stimulus funding will be the vehicle for this project. Whether or not the types of funding programs that have been discussed could be married to make up the shortfall, I think would be a long shot due to the time frames for expenditure. I hope this helps on why I don't think the bridge is viable for stimulus.
That being said there is also the Surface Transportation Bill that comes along every five years or so and it is up this year. Long story short is that these funds are also in addition to the typical appropriation process and funding is made available for projects that may not be on the top of the state DOT's list.
Here is the current status of the relevant portion of the bill. First, there is a total of $29 Billion for the US that will be allocated to the categories of projects in which this bridge would fall. The two categories are:
1. National Surface Transportation System (competitive "grant" program) that will be allocated by the Federal DOT and thus NOT SUBJECT to the state ranking system (1.5 Billion). There are requirements but this money is to be split evenly between urban and rural areas. Applications due in 180 days, project finished in 3 years.
2. Federal Highway Administration- These funds will be routed through state DOT's and subject to their "lists" (27.5 Billion). This is where the money will come from that is discussed in the WZEP blast. Funds are to be apportioned in 120 days, project must be completed in 3 years. If after 120 days, funds are not apportioned, states will lose the money and it will go to another state that have expended their funds, "use it or lose it." Another sweep will occur at a year to ensure projects are progressing.
Although these are substantial amounts, I just don't see that stimulus funding will be the vehicle for this project. Whether or not the types of funding programs that have been discussed could be married to make up the shortfall, I think would be a long shot due to the time frames for expenditure. I hope this helps on why I don't think the bridge is viable for stimulus.
That being said there is also the Surface Transportation Bill that comes along every five years or so and it is up this year. Long story short is that these funds are also in addition to the typical appropriation process and funding is made available for projects that may not be on the top of the state DOT's list.
Beach ComberAuthor
Your post definitely helped! You don't seem like a Debbie Downer to me. I appreciate a realist. I had no idea how the cash was being handled, and your and SJ's posts highlighted the potential disconnect with one group's priority list being reconciled with stringent timelines made all the more urgent by the use or lose it ax waiting to fall.
SWGB
A toll bridge is not the way to go. If you figure $2.50 (I think this is what mid-bay bridge is) in each direction is a real hit in the wallet for someone traveling for work from North of the bay. That's $25.00 per week. A toll bridge also seems unfair for the fact that they would most likely collect it on the existing bridge as well and that seems pretty backwards to me.
Beach Fanatic
SunPass definitely helps on tolls, if the powers that be knock $1.00 off each way as they do for the Mid-Bay Bridge. I say if, because I have noticed that my tolls on the Turnpike and in/around Orlando are not any less.
Still, that is $3.00 per day, pre-paid. Plus I think I had to buy the box.
Still, that is $3.00 per day, pre-paid. Plus I think I had to buy the box.

SWGB
SunPass definitely helps on tolls, if the powers that be knock $1.00 off each way as they do for the Mid-Bay Bridge. I say if, because I have noticed that my tolls on the Turnpike and in/around Orlando are not any less.
Still, that is $3.00 per day, pre-paid. Plus I think I had to buy the box.
Very true and consider that if you are traveling down here for $10.00/hr. That's over 3 hours of work just for the privilege.
Beach Fanatic
Very true and consider that if you are traveling down here for $10.00/hr. That's over 3 hours of work just for the privilege.
Whoa on the math, darlin'. $10.00 per hour (if lucky, pre-tax), not $10.00 a day. So it would be only 3.75%.
Only. Wow. I can't believe I typed that.
SWGB
Whoa on the math, darlin'. $10.00 per hour (if lucky, pre-tax), not $10.00 a day. So it would be only 3.75%.
Only. Wow. I can't believe I typed that.
Sorry about that, coffee is slowly kicking in today. Either way it's a pain in the ass centered around the wallet.
SoWal Expert
I thought there was a rule that they weren't allowed to make both the 331 and the Mid-bay toll. Wasn't that why they suspended tolls on Mid-bay after a hurricane?
Beach Fanatic
I thought there was a rule that they weren't allowed to make both the 331 and the Mid-bay toll. Wasn't that why they suspended tolls on Mid-bay after a hurricane?
They do typically suspend tolls during mandatory evacuations (health and safety), but I am not aware of any rule stating that they couldn't make 331 a toll road. If my memory is correct, they had a group come in and explain how it could likely be built sooner if it was made a toll road.
SWGB
They do typically suspend tolls during mandatory evacuations (health and safety), but I am not aware of any rule stating that they couldn't make 331 a toll road. If my memory is correct, they had a group come in and explain how it could likely be built sooner if it was made a toll road.
Sponsored by the Mid bay bridge authority?
Beach Fanatic
Sponsored by the Mid bay bridge authority?
I can't remember. It was a while ago and done by a private group that has built toll roads throughout the state and maybe other states. The issue that raised most people's ire was that the tolls would be collected even after the bridge had been paid for since these were considered investments. I know the FDOT was at the meeting and it was open to the public.
SoWal Expert
They do typically suspend tolls during mandatory evacuations (health and safety), but I am not aware of any rule stating that they couldn't make 331 a toll road. If my memory is correct, they had a group come in and explain how it could likely be built sooner if it was made a toll road.
I thought I remember it being suspended after a storm too - I was in town, which means everyone was back from any evacuation as I really err on the side of caution w/ storms.
Beach Fanatic
They also suspend tolls on the MBB if US 98 across Okaloosa Island is totally closed and looks to be so for a longer period of time. When Ike put that part of 98 under water last summer, we got two days of suspended tolls from it.
SoWal Expert
They also suspend tolls on the MBB if US 98 across Okaloosa Island is totally closed and looks to be so for a longer period of time. When Ike put that part of 98 under water last summer, we got two days of suspended tolls from it.That's what I was thinking of!

Banned
I wonder if they'll have any trouble with the Unexploded Ordinance that is in the bay mud adjacent to the 331 bridge. The military has already located several including 1 that looks to be a 1,500 bomb. That's the MUDS and UXO study.
Beach Fanatic
I wonder if they'll have any trouble with the Unexploded Ordinance that is in the bay mud adjacent to the 331 bridge. The military has already located several including 1 that looks to be a 1,500 bomb. That's the MUDS and UXO study.
Hope someone lets us know when they plan on moving that unexploded ordinance. I may make a timed trial run up already four-laned 79 across already four-laned West Bay Bridge next time I head up to NoWal from SoWal. I'll have to decide whether I want to cut back all the way on 20 to new 331 bypass in Freeport or take 81 and other scenic backroads in to town. Any plans for a toll on that bridge? Until the new Panama City - Bay County airport opens near West Bay, traffic should be easy. Miles may be more, but time may be better with construction delays. I've been wanting to make that trip again anyway.SWGB
Hope someone lets us know when they plan on moving that unexploded ordinance. I may make a timed trial run up already four-laned 79 across already four-laned West Bay Bridge next time I head up to NoWal from SoWal. I'll have to decide whether I want to cut back all the way on 20 to new 331 bypass in Freeport or take 81 and other scenic backroads in to town. Any plans for a toll on that bridge? Until the new Panama City - Bay County airport opens near West Bay, traffic should be easy. Miles may be more, but time may be better with construction delays. I've been wanting to make that trip again anyway.
No, Bay County got their bridge paid for by the state. No tolls there. IIRC they got a demycrat to push it through.