30A Detour Grayton to Blue Mountain Big Redfish Lake Bridge Construction

Kurt avatar
Admin
8,599 views
Big Redfish Drainage Improvement Project- This project will replace the existing culverts on Co Hwy 30A at Big Redfish Lake with a new bridge. The new bridge will upgrade the drainage capacity on Co Hwy 30A at Big Redfish Lake which has seen substantial damage during past storm events.

By removing the existing culverts, this project will also provide an environmental benefit by allowing the lake to function in a more natural state. All engineering, design, and permitting is complete and utility relocations are scheduled to take place in early 2017. Construction of this project is currently scheduled for after Labor Day 2017. This project is being provided by a HMGP grant from FEMA with additional funding provided by the Walton County Board of County Commissioners.

Walton County

Replies

26
SoWal Staff avatar
Serving the Community!
#2
Project on schedule - the $603, 450 cost is paid by Florida Division of Emergency Management Hazard Mitigation grant
steel1man avatar
Beach Fanatic
#3
bids opened:
Bid Number: 017-027
Bid Title: BRIDGE MATERIAL FOR BIG REDFISH BRIDGE IMPROVEMENTS
Category: Public Works Road Construction
Status: Awarded
Additional Status Information: BCC awarded 08/08/2017
Bid Recipient: Conecuh Bridge & Engineering, Inc.
Kurt avatar
AdminAuthor
#4
HMGP BIG REDFISH LAKE BRIDGE IMPROVEMENTS

The Board of County Commissioners, "The County" is seeking competitive bids from qualified contractors to construct the following project.
This project consists of constructing a new 68 foot concrete two-span vehicular bridge on concrete pilings on County Road 30-A. The project also includes demolition of the existing double metal culvert on County Road 30-A along with earthwork activities and rip-rap to stabilize the slopes under the proposed bridge. The bridge approaches will constructed with a brick paver surface along with demolition and removal of the existing roadway each direction from the bridge approximately 150 linear feet with new limerock base and asphalt proposed.

LATE SUBMITTALS RECEIVED AFTER THE FOREMENTIONED DEADLINE DATE, EITHER BY MAIL, OR OTHERWISE, WILL NOT BE CONSIDERED AND RETURNED UNOPENED. THE TIME OF RECEIPT WILL BE DETERMINED BY THE TIME RECEIVED IN THE PURCHASING AGENT’S OFFICE. IT IS THE SOLE RESPONSIBILITY OF THE FIRM FOR ASSURING THAT THE SUBMITTAL IF RECEIVED IN THE PURCHASING OFFICE BY THE DESIGNATED DATE AND TIME. NO FAXED, ELECTRONIC OR ORAL SUBMITTAL WILL BE ACCEPTED.

BIDDER IS RESPONSIBLE FOR THE DELIVERY OF IT'S SUBMITTAL. SUBMITTALS RECEIVED AFTER THE SPECIFIED DAY AND TIME WILL NOT BE OPENED. THE PURCHASING DEPARTMENT IS CLOSED ON ALL FRIDAYS.

To be considered, contractor shall submit one original and three (3) copies of the submittal in a sealed envelope or package, clearly marked with the contractors' name and address, and the words "BIG REDFISH LAKE BRIDGE IMPROVEMENTS.

Bid closes on September 7, 2017 at 10:00AM (local time) and will be opened immediately thereafter.
Kurt avatar
AdminAuthor
#5
HMGP BIG REDFISH LAKE BRIDGE IMPROVEMENTS

The Board of County Commissioners, "The County" is seeking competitive bids from qualified contractors to construct the following project.

This project consists of constructing a new 68 foot concrete two-span vehicular bridge on concrete pilings on County Road 30-A. The project also includes demolition of the existing double metal culvert on County Road 30-A along with earthwork activities and rip-rap to stabilize the slopes under the proposed bridge. The bridge approaches will constructed with a brick paver surface along with demolition and removal of the existing roadway each direction from the bridge approximately 150 linear feet with new limerock base and asphalt proposed.

LATE SUBMITTALS RECEIVED AFTER THE FOREMENTIONED DEADLINE DATE, EITHER BY MAIL, OR OTHERWISE, WILL NOT BE CONSIDERED AND RETURNED UNOPENED. THE TIME OF RECEIPT WILL BE DETERMINED BY THE TIME RECEIVED IN THE PURCHASING AGENT’S OFFICE. IT IS THE SOLE RESPONSIBILITY OF THE FIRM FOR ASSURING THAT THE SUBMITTAL IF RECEIVED IN THE PURCHASING OFFICE BY THE DESIGNATED DATE AND TIME. NO FAXED, ELECTRONIC OR ORAL SUBMITTAL WILL BE ACCEPTED.

BIDDER IS RESPONSIBLE FOR THE DELIVERY OF IT'S SUBMITTAL. SUBMITTALS RECEIVED AFTER THE SPECIFIED DAY AND TIME WILL NOT BE OPENED. THE PURCHASING DEPARTMENT IS CLOSED ON ALL FRIDAYS.

To be considered, contractor shall submit one original and three (3) copies of the submittal in a sealed envelope or package, clearly marked with the contractors' name and address, and the words "BIG REDFISH LAKE BRIDGE IMPROVEMENTS.

Bid closes on September 7 28, 2017 at 10:00AM (local time) and will be opened immediately thereafter.
steel1man avatar
Beach Fanatic
#6
Project on schedule - the $603, 450 cost is paid by Florida Division of Emergency Management Hazard Mitigation grant
Will not know the cost until September 28,2017
Kurt avatar
AdminAuthor
#7
Big Redfish Lake Bridge Closing – The bids have been received and will be considered for award at the next BCC meeting on Oct 10th.

There is an alternate price to be considered by the board to complete the project in 60 days as opposed to the 90 day base bid.

Road will be closed starting October 23rd at the bridge site. Multi-use path will be closed starting Oct 16th for utility relocates.
ejr1122 avatar
Beach Comber
#8
Is there an ETA on when the road and/or path will reopen?
steel1man avatar
Beach Fanatic
#9
One bid was for 60 days
More where for 90
Who knows who won....first week limited work....6" gas line welded in line sitting on 30A.
Jenksy avatar
Beach Fanatic
#10
Something needs to be done about the detour intersections on 98 - traffic is backed up on grayton rd going north. Need to change the light frequency or get a traffic cop.
John G avatar
Beach Fanatic
#11
Something needs to be done about the detour intersections on 98 - traffic is backed up on grayton rd going north. Need to change the light frequency or get a traffic cop.

Agree. I would move for Citizen Service Officer Leah to spearhead the whole thing. She is more than capable and should be paid as a full time staff member. She's out directing traffic at almost every wreck.
raven316 avatar
Beach Lover
#12
Is it done yet?
Beach Lover
#13
Is it done yet?

Now that's funny...
steel1man avatar
Beach Fanatic
#14
Oh yeah, finished last week, also paved 30A from 83 to Grayton and finished replacing ALL bike paths....this message will be released around Mid-February.
If your lucky.....
Low Brow avatar
Beach Lover
#15
When is it supposed to be open again?
Jimmy T avatar
Beach Fanatic
#16
When is it supposed to be open again?
End of January, but I wouldn' be surprised if it takes longer.
steel1man avatar
Beach Fanatic
#17
End of January, but I wouldn' be surprised if it takes longer.
Was by there today...No way it's ready in 3 weeks...plus 30A is scheduled for repaving and doubt bridge will open until that area is repaved and also bike paths are being torn up,and replaced....lots going on in this area..
Beach Lover
#18
Latest I heard is for completion the end of March!
Jimmy T avatar
Beach Fanatic
#19
Latest I heard is for completion the end of March!
Yikes!
Kurt avatar
AdminAuthor
#203
These photos are from 10 days ago on 1/3/18. I guess 430 pm is too late in the day to be working.

180103-blue-mountain-002-sowal-2000.jpg

180103-blue-mountain-003-sowal-2000.jpg

180103-blue-mountain-004-sowal-2000.jpg
steel1man avatar
Beach Fanatic
#21
Big Redfish Lake Bridge Closing – The bids have been received and will be considered for award at the next BCC meeting on Oct 10th.

There is an alternate price to be considered by the board to complete the project in 60 days as opposed to the 90 day base bid.

Road will be closed starting October 23rd at the bridge site. Multi-use path will be closed starting Oct 16th for utility relocates.
Should have picked the 60 day guy..(finished around 12/23) .. 90 days appox.1/23/18.....well that isn't happening!! Best guess based on progress as of 1/12/18 earliest maybe 2/23/18 +/-
Mike Jones avatar
Beach Fanatic
#22
Any project along 30A should be expedited. If tourism is your main business you can't treat the infrastructure the same as you would elsewhere.

If you want to be a 5 star destination you can't have 3 star service.
30A Skunkape avatar
Skunky
#23
Any project along 30A should be expedited. If tourism is your main business you can't treat the infrastructure the same as you would elsewhere.

If you want to be a 5 star destination you can't have 3 star service.

We have a zero star county district commissioner going to bat for us. His handlers couldn't give a damn about what the long term consequences are of killing the golden goose.
Teresa avatar
SoWal Guide
#24
Blue Mountain Beach and everyone is THRILLED that the bridge is now OPEN!

Edited

Beach Crab
#25
Blue Mountain Beach and everyone is THRILLED that the bridge is now OPEN!

Is the walking path beside this open? We are coming down in mid-May and love to use that path. Thank you!
Jimmy T avatar
Beach Fanatic
#26
Is the walking path beside this open? We are coming down in mid-May and love to use that path. Thank you!
The multi-use path between Grayton and blue mountain is closed now. Not sure when it will be open again. Hopefully, early summer.