Back to All About SoWal

Connector Road Between 30A and 98 East of Seagrove

Kaydence avatar
KaydenceBeach Fanatic
38,418 views
This is the County wanting bids for the forest road. Conservative estimates put the new connector road at minimum of $10-12 million not including mitigation land.

Review Committee Meetings - RFQ 018-027 and RFQ 018-025

Replies

126
Danny Glidewell avatar
Danny GlidewellBeach Fanatic
#27
I don't believe Ive ever heard either one of you state it one way or the other but I do know who is backing you and she is definitely anti-building so I just put 2 and 2 together. Its the same women who back Nipper and has Nipper voted yes on any projects outside her own personal project?
I don't know how to put it any plainer; I am pro economic growth and pro sustainable development. I have a record on the planning commission to back that up. I am against variances that stress our infrastructure, create future problems and increase density for no other reason than to make a few dollars more for a project. In other words, I am pro citizens and anti special interests. Since my opponent is the exact opposite, people have a clear choice.
Dawn avatar
DawnBeach Fanatic
#28
Haha thats a pretty good one but unfortunately you missed my point in order to make your joke. I guess if I were a troll Id live under the new 4 lane bridge that was built to accommodate the tourist who feed our economy.
Elitist troll!
Wouldnt You Like To KnowBeach Lover
#29
Elitist troll!

So I'm an elitist now because Im pro tourism? Can you please explain how you got to this assumption?
steel1man avatar
steel1manBeach Fanatic
#31
The first step of creating a #SouthWaltonConnector road from 30a to Hwy 98 was approved 4-1 by the Walton County Commissioners. Step 1: approving $597,780 for professional design and engineering services. #SouthWalton @WMBBTV
Shannon Lince avatar
Shannon LinceBeach Lover
#32
The first step of creating a #SouthWaltonConnector road from 30a to Hwy 98 was approved 4-1 by the Walton County Commissioners. Step 1: approving $597,780 for professional design and engineering services. #SouthWalton @WMBBTV

Pave paradise and put up a parking lot... front row center seat right here.

Shannon
FactorFiction avatar
FactorFictionBeach Fanatic
#33
The first step of creating a #SouthWaltonConnector road from 30a to Hwy 98 was approved 4-1 by the Walton County Commissioners. Step 1: approving $597,780 for professional design and engineering services. #SouthWalton @WMBBTV

Another study that goes nowhere.
Emerald Drifter avatar
Emerald DrifterBeach Fanatic
#34
$600,000. Complete, total waste of money.

How many bike paths/sidewalks could that build on existing North/South connectors? Holiday Road, 393.
Jim Tucker avatar
Jim TuckerBeach Fanatic
#35
Is it a waste of money because you don't want the road or think it won't be built?
steel1man avatar
steel1manBeach Fanatic
#36
Is it a waste of money because you don't want the road or think it won't be built?
Bingo!!!!!!!!!
EZ4144Beach Lover
#37
Bingo!!!!!!!!!
Horse done left the barn and trottin'.

I suppose it could still be shot in the head though if anyone cares about protected state lands, wildlife, and sensitive ecosystems.
ShallowsNole avatar
ShallowsNoleBeach Fanatic
#38
When traffic backed up from 395/30A to the Tom Thumb, people cried for another connector.
While traffic can still back up at times, the traffic signal has effectively alleviated most of it, or at least the times I've been through it seems to have solved a lot of the problem.
If customary use isn't upheld, many of our visitors are going elsewhere.
So, there is no need for another connector anymore.
FactorFiction avatar
FactorFictionBeach Fanatic
#39
A number of options have been looked at for another connector road. With every one of them there are common sense issues. Options either split the forest, damage wetlands, fauna, and wildlife habitat, too near to Watersound Parkway to make a difference, too near to 395 to make a difference, affect a neighborhood and on and on. Unfortunately, the favored option by those pushing for a road is along the power lines that already exist. Alabama Power may have issue with that (they own/have the easement), not to mention that Forestry is likely to say NO. About the only way I can imagine a road being approved at all through the forest would be to make it an elevated road and they cost big bucks so I find it hard to imagine Walton County spending the money for that. Worst of all is that all the St. Joe sector building that is going to occur over the next 50 years may end up using that road to get to the beach unless St. Joe is going to open up it's Watercolor/sound properties to their other developments. Building more roads typically brings more people. Just an unfortunate reality.
James BentwoodBeach Fanatic
#40
When traffic backed up from 395/30A to the Tom Thumb, people cried for another connector.
While traffic can still back up at times, the traffic signal has effectively alleviated most of it, or at least the times I've been through it seems to have solved a lot of the problem.
If customary use isn't upheld, many of our visitors are going elsewhere.
So, there is no need for another connector anymore.
Yes I think we'd be better served by adding turn lanes at existing signals on 30A and 98, and adding additional signals at danger points like next to 98 BBQ.

The 395/30A signal is working. What is the deal with the lane in front of Seagrove Market that is closed? Is that meant to be parking for the restaurants?

Checking your forum account

Please wait while we verify your forum account.