Don't know how to find the link... Will post later if someone else doesn't.
They are going to tear out the oaks and put palm trees. Medjool palms, like at Alys. Also, they are going to put brick pavers around the inside of the circle, and add a walkway around the amphitheater.
I'm for everything except the tree changes. I think date palms are tacky.
I also think this current renovation is foreboding of a complete re haul of Seaside, south of 30-A, including 4 story structures. I cite Bud & Alleys PCB as another canary in the coal mine.
Replies
150Admin
#774
Beach Lover
Is that standing water next to the stage? I thought the major impetus for the project was to solve the drainage issue?
Admin
Is that standing water next to the stage? I thought the major impetus for the project was to solve the drainage issue?
Yes - it rained very hard yesterday morning right before I took that. When everything is finished it is supposed to eliminate most or all of that. Right now there is a lot of silt which has run down to the stage that will be removed. Whatever rain falls into the bowl will still collect there but it should be much less and drain pretty quick.
Admin
#806
SoWal Insider
With the changing of the central plaza in Seaside, I realized it was the demise of the concrete parking pads, and it's doubtful there can ever be another event like the Via Colori. Does anybody have some photos of these events of the past they can share?
Beach Fanatic
Not a pretty sight or pretty site.
Beach Lover
Are those palms native to the area?
Beach Comber
Are those palms native to the area?
No!
Admin
With the changing of the central plaza in Seaside, I realized it was the demise of the concrete parking pads, and it's doubtful there can ever be another event like the Via Colori. Does anybody have some photos of these events of the past they can share?
I sure do miss it! (except for the year it went terribly wrong.) I have some here and there. The reason it stopped at Seaside was because it took over the parking.
[TABLE="width: 100%"]
[TR]
[TD="align: center"]
[/TD][/TR]
[/TABLE]
[TABLE="width: 100%"]
[TR]
[TD="align: center"]
[/TD][/TR]
[/TABLE]
[TABLE="width: 100%"]
[TR]
[TD="align: center"]
[/TD][/TR]
[/TABLE]
[TABLE="width: 100%"]
[TR]
[TD="align: center"]
[/TD][/TR]
[/TABLE]
[TABLE="width: 100%"]
[TR]
[TD="align: center"]
[/TD][/TR]
[/TABLE]
[TABLE="width: 100%"]
[TR]
[TD="align: center"]
[/TD][/TR]
[/TABLE]
[TABLE="width: 100%"]
[TR]
[TD="align: center"]
[/TD][/TR]
[/TABLE]
[TABLE="width: 100%"]
[TR]
[TD="align: center"]
[/TD][/TR]
[/TABLE]
[TABLE="width: 100%"]
[TR]
[TD="align: center"]
[/TD][/TR]
[/TABLE]
[TABLE="width: 100%"]
[TR]
[TD="align: center"]
[/TD][/TR]
[/TABLE]
[TABLE="width: 100%"]
[TR]
[TD="align: center"]
[/TD][/TR]
[/TABLE]
[TABLE="width: 100%"]
[TR]
[TD="align: center"]
[/TD][/TR]
[/TABLE]
[TABLE="width: 100%"]
[TR]
[TD="align: center"]
[/TD][/TR]
[/TABLE]
SoWal Insider
Ya know what takes parking places now? Cars...
Admin
#878
Admin
#883
SoWal Guide
Can't wait to see the final product!
beats on hood
Can't wait to see the final product!From the post by miz notebook, it looks like you'll have to wait until 2030 for the plan to be completed.
Beach Fanatic
From the post by miz notebook, it looks like you'll have to wait until 2030 for the plan to be completed.
Didn't think I had posted on this thread....?
beats on hood
Sorry, miznotebook,I was in error. It was second wind in post #7 who pointed us to the future plans for Seaside. I was just thinking it was you because you are always able to retrieve information for us, and I thank you for that.
Just curious, y'all. When will the food trucks be gone? When will the post office be gone? When will they start demolishing the part of Seaside south of 30A? Let's see, it's all supposed to be finished by 2030. Are they going to drag out the new Seaside construction a little at a time for 16 years so it always is under construction and looks like hell all the time as it does now, or are they going to wait until, say 2025 and just do it all at once? Or something in-between?
Just for the record, we love visiting Seaside. Except during spring break, we are there every day when in town (which is very frequent now that we have a second home in SoWal that is not a rental).
Just curious, y'all. When will the food trucks be gone? When will the post office be gone? When will they start demolishing the part of Seaside south of 30A? Let's see, it's all supposed to be finished by 2030. Are they going to drag out the new Seaside construction a little at a time for 16 years so it always is under construction and looks like hell all the time as it does now, or are they going to wait until, say 2025 and just do it all at once? Or something in-between?
Just for the record, we love visiting Seaside. Except during spring break, we are there every day when in town (which is very frequent now that we have a second home in SoWal that is not a rental).
Beach Fanatic
The pavers are about half done and fencing has been moved back on about half the circle so parking is returning. The inside concrete curb on the inside of the palms will get a coral stone cap like is on the stage.
SWGB
The pavers are about half done and fencing has been moved back on about half the circle so parking is returning. The inside concrete curb on the inside of the palms will get a coral stone cap like is on the stage.
That took, what, 2 years for the stage? Have they perfected the process so it's done sooner?
Beach Lover
Yes it was me!
Continue to follow your arrow Seaside!!
Continue to follow your arrow Seaside!!
Admin
#962
Admin
#976
Beach Comber
Hi All - new to this forum. Thanks for posting all the photos. Does anyone know the "new" timeline for completion?
Admin
Hi All - new to this forum. Thanks for posting all the photos. Does anyone know the "new" timeline for completion?
Welcome!

The current work will be finished in a week or so - just a guess.
The further evolution of Seaside Town Center is day to day.
Beach Fanatic
Published report WAS March 1, 2014.."Lots of seaside home owners telling renters in Feb. To come on for spring break and enjoy amphitheater
" ready March 1.
" ready March 1.
beats on hood
Read back to earlier posts. I read that it's an ongoing project that won't be finished until 2030. That is, unless those in control of Seaside have changed developers/whatever after the early plans/dates were posted on this thread.
Things change forever. Our earthly life goes on for a limited amount of time. So roll with it. Now if I were 16 years younger, I might have a different attitude.
Things change forever. Our earthly life goes on for a limited amount of time. So roll with it. Now if I were 16 years younger, I might have a different attitude.
Checking your forum account
Please wait while we verify your forum account.