Back to All About SoWal

Scenic 30a Open - Draper Lake Bridge Construction Complete

Kurt avatar
Admin
31,942 views1
Walton County

Road Closure Notification for County Highway 30-A between Gulf Place and Blue Mountain Beach

Detours routes will be implemented via CR393 to US Hwy 98 to CR 83.

[Update - the official detour has been moved east to 283 (Grayton Rd) instead of 83 (Blue Mountain Rd) to relieve congestion at 83 and 98 which has no traffic light. The light at 98 and 283 should make the route safer. ]

Message boards and detour signage will be installed prior to the road closure taking affect.


Walton County Public Works is scheduled to facilitate the closure of County Highway 30-A beginning September14, 2015 to begin construction of a new bridge at Draper Lake.

The road closure will take place approximately .80 miles east of CR 393 at Draper Lake.

The bridge construction project and the associated road closure will restrict thru traffic for the duration of the project. The bridge construction project is scheduled to be complete by March 1, 2016.

Please contact Walton County Public Works at 892-8108 with any questions related to this project.


detour.png

Edited

Replies

104
Kurt avatar
AdminAuthor
#3
VERY IMPORTANT

Restaurants and other businesses on Scenic 30A between Gulf Place (393) and Blue Mountain Beach (83) are going to suffer from a decrease in traffic, during what is already a slow period.

Please think about them and take your business there! Even if you have to go out of your way.

Cafe Bolo
Highlands House
Goatfeathers
Local Catch
Cafe Tango
Basmati's
Sally's
Johnny McTighe's
Marie's Bistro
Grecian Gardens
Redd's Fueling Station
For The Health Of It
Big Daddy's Bikes
Laloba's Bakery
Nick's On the Beach


Sorry if I missed anyone please post on this thread!

Edited

shakennotstirred avatar
Beach Fanatic
#4
Will this also affect the bike path?
Kurt avatar
AdminAuthor
#5
Will this also affect the bike path?
Good question.


The bike path will be closed at intermittent times when they are actively driving the pilings for the new bridge. At all other times, the path will remain open.
Louis E. Svehla
Public Information Manager
Walton County BCC
Jimmy T avatar
Beach Fanatic
#6
I'm curious what the new bridge will look like. Has anyone seen plans?
steel1man avatar
Beach Fanatic
#7
I'm curious what the new bridge will look like. Has anyone seen plans?
Better be a Beautiful one, if it takes 6 months ( min.) to replace a 30' two lane bridge over a ditch.
Lake View Too avatar
SoWal Insider
#8
It's a difficult location.Maybe 60' drop off to creek below. Not an easy access project.

Edited

Matt J avatar
SWGB
#9
Could be a bad ass span further up to eliminate the dip and give a great view over the bike bridge, but I'm not holding my breath.
Lake View Too avatar
SoWal Insider
#10
Yeah, that would be sweet, but highly unlikely.
Jimmy T avatar
Beach Fanatic
#111
StJohnsBridge1.jpg
Something like this would be nice. :)
Lake View Too avatar
SoWal Insider
#12
So... who wants to put wagers on the time it takes to complete this project...I'm pretty bad with memory, but didn't the last, flat level bridge in Dune Allen take about a year? I'm assuming, of course, they will use the same contractor...:blink:
steel1man avatar
Beach Fanatic
#13
Thread says " starting Sept. 14" so guess what?? they are now 48 hours late starting. Sept 15 still open. #latestart ..
Bets on March 1 2016 completion ?
sunspotbaby avatar
SoWal Insider
#14
Does Walton county have a traffic engineering manager like Bay county? Just wondering if we have anything more than a road crew that half-ass fixes potholes. Those of you that have to deal with this already delayed bridge closing... I feel for ya.
Truman avatar
Beach Fanatic
#15
So... who wants to put wagers on the time it takes to complete this project...I'm pretty bad with memory, but didn't the last, flat level bridge in Dune Allen take about a year? I'm assuming, of course, they will use the same contractor...:blink:

Doubt it.
Bridge Near Fort Panic
Matt J avatar
SWGB
#16
Does Walton county have a traffic engineering manager like Bay county? Just wondering if we have anything more than a road crew that half-ass fixes potholes. Those of you that have to deal with this already delayed bridge closing... I feel for ya.

No, we also don't elect state representation that diverts ridiculous amounts of money for both infrastructure and to pad a political cronies pocket.

To be fair our public works folks have a huge job with the largest county in the state. I still feel they did an excellent job with the repaving in Seagrove despite causing housewives to miss mani/pedi appointments, but they can speed through at twice the speed limit on that new coating!

Also keep in mind that the large salaries are reserved for elected officials and produce nothing layers of management. How long would you last in the hot sun over hot asphalt for around $10/hr.?
sunspotbaby avatar
SoWal Insider
#17
No, we also don't elect state representation that diverts ridiculous amounts of money for both infrastructure and to pad a political cronies pocket.

To be fair our public works folks have a huge job with the largest county in the state. I still feel they did an excellent job with the repaving in Seagrove despite causing housewives to miss mani/pedi appointments, but they can speed through at twice the speed limit on that new coating!

Also keep in mind that the large salaries are reserved for elected officials and produce nothing layers of management. How long would you last in the hot sun over hot asphalt for around $10/hr.?

I understand where you're coming from, but being the largest county and having little in the way of planning or foresight and poor infrastructure, we should have a higher standard here than mediocre pavers. They left a bowl in our street, so guess where it floods...yep, my yard.
Matt J avatar
SWGB
#18
I understand where you're coming from, but being the largest county and having little in the way of planning or foresight and poor infrastructure, we should have a higher standard here than mediocre pavers. They left a bowl in our street, so guess where it floods...yep, my yard.

No problem. Are you paying cash or check?

I'm not saying it's entirely a funding issue, but you get what you pay for.
Sun Chaser avatar
Beach Lover
#19
As I recall, when our neighbor Mike Huckabee got involved last time on this, that temp bridge was up in, like, a week. I vote for The Governor to be Adjunct Project Manager.
steel1man avatar
Beach Fanatic
#20
As I recall, when our neighbor Mike Huckabee got involved last time on this, that temp bridge was up in, like, a week. I vote for The Governor to be Adjunct Project Manager.
No, that was redfish lake , the drive over ( no bridge) clogged drain and caused SOME road wash out. Road sat closed for over a month. County thinking about a fix. Huck calls fl. Governor ... job done and finished in a week.

There is NO way Draper should take 6 months. ( min) probably much more.

Once word is out that 30A is closed Spring breakers will disappear. Maybe that's NOT bad
Matt J avatar
SWGB
#21
It's gotta close first. It was open yesterday.
Andy A avatar
Beach Fanatic
#22
Latest word on Draper bridge closing. It was delayed due to a problem with the electronic sign board. It is suppose to close today.
Old School avatar
Beach Crab
#23
It's a difficult location.Maybe 60' drop off to creek below. Not an easy access project.
60 feet????
Lake View Too avatar
SoWal Insider
#24
I looked at it, on foot, right after the washout happened. Can I amend my recollection to 40'? I just remember wondering how any equipment was going to get down and around there to reinforce that very steep embankment. Maybe skilled drone operators can supply us good recon of the entire project, from beginning to...it is going to end, isn't it?:cool:
second wind avatar
Beach Lover
#25
Bridge was open at 11am today. But by the time we finished lunch at La Paya around 12:15 it was closed. And so it begins...
Beach Comber
#26
Kurt, Thanks for the heads up on local businesses remaining open and accessible during the bridge closure. Basmati's Asian Cuisine is open for Lunch Monday thru Friday , 11am til 2:30, Dinner every night at 5pm. Happy Hour from 5 to 6 Every night. Stop by and see us!

Checking your forum account

Please wait while we verify your forum account.