Surprisingly, he made no mention of opening up full service to a new hub at THE? Beach Airport. :roll:
The one discount airline that might be a good fit for PCB, provided the local hotels and condo management firms play nice, is Allegiant Air, which specializes in low cost airfare plus hotel packages.
Discount Flights and Vacation Packages | Airfare & Hotel Packages from Allegiant Air
I hadn't heard of them until parents recently mentioned that they could now get a super cheap direct flight with them from Grand Rapids to either Las Vegas or Orlando, but it seems like PCB would work well with their existing business model.






The new airport under construction near West Bay is proceeding on schedule and should be completed by the May 2010 target date, airport officials said Friday.
Jeff Dealy of KBR, program manager for the relocation project, said he was more worried about getting the various agency occupants moved onto the complex in a timely fashion.
"That would be our one hiccup," Dealy said. He was referring to the different agencies slated to move into the new terminal structure, including the Transportation Security Adminstration, U.S. Customs and Border Protection and various car rental firms and air carriers.
"Everyone is up to date, but there is still some work to be done," he said.
Space also is being allocated for a Bay County Chamber of Commerce Business Center and the Bay County Tourist Development Council, said Randy Curtis, executive director of the Panama City-Bay County International Airport, which is moving its operations to the new site.
The 8,400-foot runway is now 100-percent complete, and construction teams are awaiting FAA approval before extending it to 10,000 feet. Once approval is gained, the extension should take about two months to complete, officials said.
The 120,000-square-foot airport terminal, more than twice as large as the current structure in Panama City, is now about a third complete, Curtis said. The $62.8 million terminal complex always has been seen as the heart of the new $318 million airport taking shape near West Bay. The old terminal was only about 57,000 square feet, Curtis said.
"They are getting pretty close, about two-thirds, to at least having everything under a roof," he said.
Curtis said the new terminal complex will not only consist of the main terminal and a 147-foot air traffic control tower, but will host a public safety building, a maintenance building, a cargo building and a rental car area.
"We are all moving toward that May date," Curtis said.
On its first floor, the main terminal will house a ticket area for airlines, space for five rental car agencies, a baggage claim area with three conveyer belts, a restaurant and a gift shop with newsstand, Curtis said.
The upper level will consist of the passenger boarding area, airport administration offices, a second restaurant and a lounge area dedicated for the military.
One of the main goals of the new airport has been to "make it more efficient for processing both baggage and passengers," Curtis said.
Jeff Dealy of KBR, program manager for the relocation project, said he was more worried about getting the various agency occupants moved onto the complex in a timely fashion.
"That would be our one hiccup," Dealy said. He was referring to the different agencies slated to move into the new terminal structure, including the Transportation Security Adminstration, U.S. Customs and Border Protection and various car rental firms and air carriers.
Edited
Southwest does not operate on the hub and spoke principal. The closest thing they have to a hub is Dallas only because that's where they are based. All of their service is point to point with no luggage agreements with other air lines.
Of all the theories of new service to the airport, Southwest makes the most sense. They have low overhead and serve an area of the country that does not have direct access to NW Fla without connecting. If they come, look for two or three flights a day to start with, but considering the fact that there are so many empty seats flying into PC, it may be a while before we see any big changes...
I find it rather telling that I have lived here for years and this was the first time I (or anyone in my family) flew into PC - cost/schedule was never better than VPS or Pensacola and the only reason I did it this time was because I hitched a ride outbound on a friend's plane (and you can't do that from VPS).
IF (and they're big ifs) the new airport has a better prices/schedules I could see flying out of PC, but realistically believe the Scootermobile will be heading west for air travel for many years to come.
When it comes to Panama City’s new airport, Jerry Ray speaks with the passion and conviction of an evangelist. Much like a preacher with a Bible, he’s armed with his own historical perspective.
For instance, the beachside Florida Panhandle hotspot, long popular with spring breakers and summer vacationers, was known as a major port in the early 20th century. Originally called Harrison, it was renamed to connect with the still-new Panama Canal and was convenient to ships from both the Gulf of Mexico and the Pacific Ocean.
“They knew all this in 1914 and we have forgotten,” says Ray, senior vice president of strategic alliances with the Jacksonville-based St. Joe Co. He notes that Panama City’s premier port status lasted from 1915 until the 1929 market crash that led to the Great Depression.
Now the city has an opportunity to restore its trade status by way of a new international airport being developed as part of St. Joe’s 75,000-acre West Bay project, which Ray believes will be a national focal point for development over the next 50 to 100 years. The $500-million project is scheduled to finish its first phase in May 2010, with the airport component being built on a 4,000-acre site donated by St. Joe to the Panama City-Bay County Airport Authority.
Already having faced criticism for developing an airport that will be one of Florida’s largest in a metropolitan area with only 164,000 residents, Ray counters that it will reach beyond Bay County to an area known as the “deep Southeast,” encompassing parts of neighboring Alabama and Georgia in addition to the Panhandle within two-and-a-half hours driving time. The first 8,400 feet of the airport’s 10,000-foot runway is already finished and is currently being used by helicopters, though it is ready to accept planes, he says.
“This is planning for the future, rather than remediating the past,” Ray tells Real Estate Florida. He adds that the new airport will be tied to the city’s old seaport in a multimodal grid, sending cargo containers by truck and rail throughout the US.
The airport’s proximity to Tyndall and Eglin Air Force Bases also bolsters the argument that Panama City is the correct location, Ray says. “There’s really only one place it can go,” he says, “and that’s right where it is.”
Ray also promotes the new Panama City International Airport as the nation’s “greenest,” not only in terms of seeking LEED construction certification from the US Green Building Council but creating a conservation buffer around approaches that will make plane noise a non-issue for nearby businesses and residents. The 41,000-acre preservation area will ultimately protect 44 miles of undeveloped shoreline and another 33 miles of creeks and tributaries.
“We have to make economic growth and environmental protection work in concert,” Ray says. He adds that St. Joe consulted with various environmental groups over the past 11 years leading to the airport’s current development.
St. Joe is working with the Haskell Co. and TranSystems Corp. on master planning its land adjacent to the airport, with the first 1,000 acres including a mix of industrial, office and retail. The group’s initial marketing focus will be aerospace, logistics and defense-oriented technology companies.
“We are accelerating our preconstruction activity and stepping up marketing out reach to global users who need ready access to the new airport,” says Britt Green, St. Joe president and CEO. “It’s truly a unique opportunity to be part of one of Florida’s largest mixed-use planning developments.”
Ray says the initial phase of commercial development near the airport will entail 37 million square feet of industrial buildings with either direct or fence access to its tarmac. The mixed-use components of West Bay will be developed in 1,000-acre increments, with the market deciding what is built next, he says.
“Commercial real estate value occurs where there is connectedness,” he says. “If you are feeling constrained at an urban-encroached airport, this is the alternative.”
Steve Halverson, Haskell Co. president and CEO, says West Bay presents exciting prospects for commercial development. “There are very few greenfield opportunities with a strategic location and high-quality access to an airport, a deepwater port, road and rail connections,” he says.
Local real estate agents are positive about the prospects of additional commercial development to be derived from the new airport. “Expected increases in commercial and residential developments are expected to reshape the Panama City area’s economy by increasing the tourism trade, attracting more corporate headquarters and large distribution centers and providing new residential communities,” says Jennifer MacKay of Keller Williams Success Realty.
Ray points out that the biggest challenge for West Bay and the airport will be maintaining flexibility of development in decades to come. “This is a place that is going to have options for the future,” he says, “and that brings about value.”



With only 10 months before the planned opening of a new airport near West Bay, a Tuesday meeting of the Airport Authority pointed to a surprising number of unresolved issues still plaguing the airport relocation project.
From the necessity of a crosswind runway to final FAA approval of a main runway extension to reaching a lease agreement with general aviation pilots, the final shape of the new airport still is unclear.
"It's a pretty complex process," airport Executive Director Randy Curtis said. "Though, I don't think there have been any big surprises."
Project relocation manager Jeff Dealy of KBR told authority members that airport construction was on schedule and 61 percent complete. But the airport still had not reached a lease deal with Bay Aircraft Owners Inc., a consortium of private pilots based at the current airport in Panama City, airport attorney Michael Duncan said.
He said negotiations with the pilots' association were still unresolved over how its lease would transfer to the new Panama City-Bay County International Airport, set to open in May 2010.
The group of about 26 Bay Aircraft pilots long has been wrangling with the Airport Authority over the terms of their 30-year lease agreement, which has about 14 years left to run.
Duncan requested the Airport Authority have a special meeting within two weeks to discuss the matter, along with lease problems with Precision Air Services, a company that offers inspections and repairs for most general aviation aircraft. He said mediation with Precision had reached "an impasse."
It also remains unclear whether authority members will build the 5,000-foot crosswind runway, a proposed asphalt strip separate from the main concrete runway that could increase flight safety, a factor crucial to drawing larger carriers.
James Finch of Phoenix Construction Co., which has built the main 8,400-foot runway, told authority members Tuesday he wanted to withdraw from his option to build the crosswind runway, allowing the board to re-bid the project.
The option by Phoenix to build the second runway at the same rate structure as the first has expired. Board members say given the uncertain economy, it remains unclear whether rebidding the project will cost the airport more or less money.
Curtis said Tuesday the reality of a $17 million secondary runway will depend on how other financial considerations "play out" as the airport moves forward.
The airport is also waiting final Federal Aviation Administration approval on extending the 8,400-foot main runway to 10,000 feet, which has long been a goal for the new airport.
Airport Executive Director Randy Curtis said approval is being held until the airport and the Florida Department of Environmental Protection could agree on a final consent order spelling out corrective measures for storm-water discharge violations.
The DEP launched an investigation of the airport's construction after heavy rains in April, claiming noncompliance with construction permits.
On Tuesday, Roy Willett of KBR told board members that DEP was being given weekly progress reports and that825acresofthe1,400-acre construction site was in a state of "final stabilization." Authority Chairman Joe Tannehill requested that all board members receive daily e-mails on the progress.
The Florida Department of Environmental Protection has set a July 15 deadline for the Airport Authority to agree to corrective measures for stormwater discharge at the new airport construction site, officials said.
Dick Fancher, director of the DEP's Northwest District, said the airport already has taken some curative action since heavy April rains stressed an inadequate drainage system that failed to stem an unhealthy discharge of sediment into nearby creeks.
The consent order will formalize the continued cleanup from the environmental damage caused by the deluge and spell out future action required to prevent another occurrence, he said. The order includes a $299,000 fine.
Some environmental damage has taken place in streams and creeks leading to the waters of West Bay, and the damage must be monitored and corrected, Fancher said. Click here to see photos of the airport's construction.
The illegal discharge has led to a flurry of recriminations from environmental groups, many of which originally opposed the $318 million airport's construction on 1,300 acres near West Bay. The airport is set to open in May 2010.
The latest pressure has come in the form of a letter to DEP from the St. Andrew Bay Resource Management Association (RMA), asking the state agency to "suspend its reliance on self-reporting by the contractor, a process which has eroded public's confidence in your agency's oversight role."
Fancher said the DEP has been reviewing weekly reports on the airport's self-monitoring, insisting that, "We are at the site on a weekly basis."
In the letter to the DEP, RMA president Kennard Watson said that his group was "particularly concerned about potential impacts of the degraded water quality to fragile seagrass beds in West Bay."
Randy Curtis, executive director of the Panama City-Bay County International Airport, said the airport has been working continuously with DEP experts to solve the ongoing discharge problems. The formal consent order, including the amount of the fine, has been under negotiations with the DEP, he said.
"We have received the revised consent order," he said, noting the biggest sticking point has been the amount of the fine.
Curtis said the Airport Authority likely will call a special meeting prior to the July 15 deadline to decide whether to agree to the order's stipulations. If an agreement is not reached, the matter would go through an "administrative hearing" process, he said.
The consent order outlining the airport's environmental problems is the result of a DEP investigation triggered by heavy rains in late March and early April, a period during which the National Weather Service recorded about 14 inches of rain in Panama City.
The DEP issued a proposed consent order May 19 that called for nearly $400,000 in penalties. The airport responded by blaming much of the problems on heavy rains and questioning the fine.
Fancher said the $299,000 in penalties outlined in the current consent order will be assessed on the Airport Authority. Additional fines could be forthcoming on individual contractors such as Phoenix Construction Co., which was responsible for the new airport's site preparation, he said.
Most of the country is waiting for the economy to turn, or even for the federal stimulus to have some measurable effect on local economies, but at least one part of the country has a third option. In the Florida panhandle, in particular the Panama City area, a new international airport--under construction, scheduled for completion next year--promises economic stimulation, both in terms of business growth and real estate development.
"A new business community will be able to grow around the new airport in a way that's impossible around the existing airport, which is too small and too hemmed in for further expansion," Randall S. Curtis, executive director of the Panama City-Bay County International Airport, told CPN. "But the long-term impact will involve more than development in the immediate vicinity of the airport. The entire region stands to benefit."
Indeed, the existing smallish airport--two runways, 6,308 feet and 4,884 feet long, on 745 acres--may have been hindering the area's growth while the rest of Florida has expanded mightily. Bay County is still fairly small, experiencing only modest growth in recent years, with its population expanding from about 127,000 in 1990 to 155,000 now, according to the U.S. Census Bureau. Located on a complex of bays (St. Andrews, West, North and East bays) on the Gulf Coast, the area has access to miles of desirable beaches and other natural amenities, but mainly draws vacationers and second-home buyers mainly from the nearby states of Mississippi, Alabama and Georgia.
New airports in other parts of the country, in fact other parts of Florida, also have a history of spurring growth over the long run. The Southwest Florida International Airport opened in Ft. Myers in 1983, and during the 1990s the population of Lee County (county seat, Ft. Myers) grew 31.6 percent, considerably faster than the rest of the state, and the area has continued to grow in the 2000s.
Curtis posited that after larger jets are able to fly into the area, more visitors will start coming from the cities of the Midwest and the Northeast. Ultimately, that may mean not only more vacationers, but more businesspeople with site selection on their minds, and more real estate investors.
The existing main landowner in that part of Florida, St. Joe Co., already stands to benefit enormously from the new airport. Formerly a paper company with vast acreage devoted to growing trees, St. Joe is now a company with vast acreage (about 800,000 acres) to develop. The company was instrumental in realizing the airport project, especially through its donation of the land necessary to build it.
The basic specifications of the $330 million new Panama City-Bay County International Airport include a primary runway of 10,000 feet (expandable to 12,000), a crosswind runway of 5,000 feet and a 120,000-square foot terminal building, occupying 1,300 acres on a 4,000-acre site. That will be the configuration of the airport when it opens next year, anyway. As air traffic increases, there's additional room for another runway the size of the primary one, plus an expanded terminal facility.
Currently, the Airport Authority is negotiating with low-cost air carriers about flying into the new airport, which Curtis calls a key component in spurring future development in the region. Bagging such an airline to fly in and out of the new airport is so important that a small increase in Bay County's bed tax was approved to pay for the effort.
Besides aviation-related facilities, the airport will have about 1,200 acres available for on-site industrial or other commercial development, including sites with direct runway access. "We've gotten the attention of the aerospace industry, for one," said Curtis. "Among other aerospace interests, this part of Florida, centered on Tyndall Air Force Base, is a major center for unmanned vehicle R&D."
The airport itself is only a small part of an entity called the West Bay Sector Plan, a master plan for 75,000 acres along the West Bay just northwest of Panama City that has been in the works for about a decade. Land use for West Bay Sector Plan calls for the ultimate development of about 37 million square feet of commercial property and 27,000 residential units, to be undertaken by a variety of developers. Jones Lang LaSalle has been hired as to oversee development with the West Bay Sector Plan, and is currently in negotiation with a master developer for the properties within the new airport.
Environmentalist opposition to the new airport was relatively mute because of the enormous conservation easements both within the new airport property and as part of the overall West Bay Sector Plan. All together, 41,000 acres of the total of 75,000 acres, including 33 miles of West Bay shoreline and 44 miles of creek and tributaries, will be never be developed.
"The West Bay Plan is a long-term plan that will encourage development in the long run," Janet Watermeier, executive director of the Bay County Economic Development Alliance, told CPN. The economy may be unfavorable to real estate development in the near term, but "when the economy turns, a template for development in Bay County in the area will already be in place."
Jerry Ray is looking to the future. His firm, the Jacksonville, Florida-based St. Joe Companies, is working with the Bay County Board of Commissioners, officials at the Panama City-Bay County Airport and members of the National Audubon Society on the LEED-certified Panama City-Bay County Airport. The facility is the first piece in the West Bay Sector Plan, a massive mixed-use project destined for Panama City, Florida, and surrounding areas. The aggressive but environmentally responsible development strategy calls for an eventual 27,000 residences and 37 million square feet of commercial and industrial space spread across 75,000 acres.
Though part of the plan may be complete in a few years, the entire project will not materialize for at least half a century. “I will not see it; I am too old,” says Ray, senior vice president of strategic alliances for St. Joe.
The airport is a relocation and expansion of Panama City’s current facility and includes a 105,000-square-foot passenger terminal, two runways and 1,400 acres reserved for future expansion. Completion is expected next May. The airport only represents a small part of St. Joe’s $500 million stake in the West Bay Sector Plan, a commitment that will include 4.4 million square feet of commercial space and 6,300 residences.
St. Joe also brought in leaders from the Audubon Society to conduct land-protection studies around the airport. Their goal was to ultimately protect 44 miles of undeveloped shoreline and creeks and tributaries near the development site. The society also helped make the airport as environmentally friendly as possible; green features include a water reclamation system among and more standard LEED requirements.
“One of our commitments was to put in place a saltwater system that would return water to the environment cleaner than it was in the natural environment. We said we would return it twice as clean, according to scientific measurements,” Rays says. “We want to demonstrate that it is possible to have economic development and environmental preservation simultaneously.”
In large projects like these, extensive planning is important. With the help of Jacksonville-based The Haskell Company and TranSystems Corporation of Kansas City, Missouri, St. Joe is positioning parcels for office, retail and industrial construction. “You look at all the infrastructure — where do the roads go, where do the utilities go, all those types of things,” says Haskell’s Brad Slappey. “You don’t want to commit to something that’s not flexible enough to reverse. You want to be very careful about where your infrastructure goes, so it can accommodate multiple uses down the road.” It’s too early, however, to talk development specifics or even mention future tenants. “There’s certainly interest in the area,” Slappey says. “Any time you have an airport, there’s interest.”
One large advantage of the plan is that it’s easy to build to each tenant’s specifications. With so much greenfield land available for developing, officials at large companies can easily come in, commit to a space and mold it to their requirements. “Most of the time, your options are limited because you have a small piece of land and everything around it is already developed,” Slappey says. “The advantage is that if you have a big user that comes in and wants this, that and the other, it’s easier to accommodate them because you have a lot more land to maneuver around.”
The West Bay Sector plan is a fulfillment of years of history. Development has come slowly to Northwest Florida for a variety of reasons. Commercial space tends to flock to major interstates, and there are few that cut through this portion of the state. In addition, geographical concerns and the rising environmental consciousness of area citizens had limited the county’s commercial real estate growth prospects.
“The land is largely owned by two entities; one is the United States government and other government entities, the other is The St. Joe Company, which began to buy land in this area in 1923,” Ray says. “Between the two, a lot of the land was left in a rural state. This is an area of Florida that’s not been as well connected to the rest of the country.”
Developers and citizens in Panama City realized as early as the 1940s that something needed to be done to compete on a national scale and started calling for an update of the city’s existing municipal airport. “There was a front-page editorial in the Panama City News Herald, and it said if we do not connect ourselves to the rest of the country, we will languish in our economic development,” Ray says. This led to an ultimately unsuccessful effort to rebuild the airport, a dream that resurfaced in the 1960s and again in the ’80s and ’90s. “We had no idea how long it would take. No one had never done this before,” Ray says. “It is a 100-year project. It will correct something that has been a mess now for 50 years.”
An undertaking this large will undoubtedly change many times during the course of development. Starting small and branching out is a smart way to ease into the project. Once the airport is complete, it will attract airport services, which will, in turn, encourage hotel and retail growth. Warehouses, Slappey says, pop up around airports for logistics purposes. “After that, who knows. You start with the obvious, and go from there,” he says. “It’s always hard to get your hands on what it will look like in the end. The reality is that it’s going to change as the years progress.”
Ray is happy developers in Central Florida are finally planning for the next generation of tenants. Long-term projects like the West Bay Sector Plan are where commercial real estate officials should be heading, Ray says.
“We’d make a lot more in this country by planning for the future, and we never do it. We have roads that are clogged up and then we go fix them, right? So, why not try it the right way for once?”
Kurt, thank you for the continuous updates on the progress of the new Panama City Airport. They are really appreciated by those of us who believe that long range planning regarding growth is the only way to go.
Do you have anything on the status of the suit brought about storm water drainoff and how it will affect the ongoing status of the project?
It seems to me from all I read about the long range plan, environmetal issues are at the forefront of considerations. But then, I am not an environmental extremist. Once again, thank you for the great updates.
Kurt, thank you for the continuous updates on the progress of the new Panama City Airport. They are really appreciated by those of us who believe that long range planning regarding growth is the only way to go.
Do you have anything on the status of the suit brought about storm water drainoff and how it will affect the ongoing status of the project?
It seems to me from all I read about the long range plan, environmetal issues are at the forefront of considerations. But then, I am not an environmental extremist. Once again, thank you for the great updates.