just hope all is on track.
Beach Runner beats on hood Jul 9, 2005 15,269 822 Near the ATL and in SoWal as often as possible Jan 31, 2012 #2 Overheard a contractor's conversation. The opening is planned in two weeks. IMHO I don't see that happening, but an opening could occur in four weeks. The progress since two weeks ago is amazing.
Overheard a contractor's conversation. The opening is planned in two weeks. IMHO I don't see that happening, but an opening could occur in four weeks. The progress since two weeks ago is amazing.
groveral Beach Lover Jul 11, 2005 224 26 birmingham Feb 12, 2012 #3 thanks, will be down this week and check it out...
Dawn Beach Fanatic Oct 16, 2008 1,332 556 Feb 12, 2012 #4 From the looks of the building they are missing about 100 parking spaces. Which if they had them would mean they had 110.
From the looks of the building they are missing about 100 parking spaces. Which if they had them would mean they had 110.
Beach Runner beats on hood Jul 9, 2005 15,269 822 Near the ATL and in SoWal as often as possible Feb 12, 2012 #5 Not ready. And it's been two weeks. It looks nice. I like the soft amber lights on the top deck.