Beach Operations will host a public meeting at 5 p.m. on Aug. 24 in the South Walton Annex Building at 31 Coastal Centre Drive. Three concepts have been created, and the public is invited to attend and provide input on the designs.
Plans include:
Construction is anticipated to begin fall 2027.
View attachment 111741View attachment 111742View attachment 111743
Plans include:
- Increase Parking Capacity
- Resurface Gulfview Heights St.
- Resurface Parking Areas
- Multi-use Path Realignment
- Increase Accessible Parking
- Update Signage & Pavement Markings
- Enhance Beach Tram Stop with Shelter
- Low-speed Vehicle Parking
- Landscape/Hardscape
Construction is anticipated to begin fall 2027.
View attachment 111741View attachment 111742View attachment 111743