I'd be interested in the timeline. As usual, the Seaside half marathon plans on heading right down 30A. They buttoned up the last bridge they replaced right before the race. Assuming there will be the same push or a plan B by the race organizers.
Bike path is still closed. The bridge decking is down and they are working on the road leading up to the bridge. I heard they were supposed to be done by the end of the month.
Bike path is still closed. The bridge decking is down and they are working on the road leading up to the bridge. I heard they were supposed to be done by the end of the month.