Please note that the temporary signal located at the C.R. 83/U.S. 98 intersection will be switched to “Flash Mode” on March 2, 2016, and will remain so until Big Redfish Lake Bridge is constructed. At that time the signal will be allowed to operate for maintenance of traffic during the construction activities. We are pleased to report the Draper Lake Bridge Project has opened ahead of schedule.So how long will it take for the stop light @ 83 and 98 to come down? Please don't say it' permanent.