• Trouble logging in? Send us a message with your username and/or email address for help.
New posts

Teresa

SoWal Guide
Staff member
Nov 15, 2004
30,311
9,314
South Walton, FL
sowal.com
U.S. 98 WIDENING CONSTRUCTION
WALTON COUNTY WEEKLY TRAFFIC ADVISORY


U.S. 98 Widening from Mack Bayou Road to C.R. 30A –

Drivers may encounter intermittent single-lane closures for the U.S. 98 east and westbound travel lanes, from West Hewitt Road to C.R. 30A, Tuesday, May 30 through Thursday, June 1 between 7:30 p.m. and 5:30 a.m. These closures are required to prepare for a slight shift of the U.S. 98 east and westbound travel lanes toward the outside of the roadway.
___________________________________________

U.S. 98 Resurfacing from Village Road to East of U.S. 331 –

Drivers may encounter the following traffic impacts Tuesday, May 30 through Thursday, June 1:
Intermittent U.S. 98 east and westbound lane closures between 7:30 p.m. and 6 a.m. for paving operations.
Intermittent closures of the U.S. 98 east and westbound outside shoulders and turn lanes may be required as crews construct new sidewalks and widen existing turn lanes between Village Road and U.S. 331.
Temporary intermittent U.S. 98 east and westbound outside lane closures, from Village Road to Mack Bayou Road, from 9:30 a.m. to 2:30 p.m. to deliver concrete for sidewalk, curb and gutter construction.

U.S. 98 Widening from east of U.S. 331 to Peach Creek –
No construction-related traffic impacts are planned for next week.

All activities are weather-dependent and may be delayed or rescheduled in the event of inclement weather. Drivers are reminded to use caution, especially at night, when traveling through a work zone and to watch for construction workers and equipment entering and exiting the roadway.

FDOT

FB_IMG_1685139952449.jpg
 
New posts


Sign Up for SoWal Newsletter