Big Redfish Drainage Improvement Project- This project will replace the existing culverts on Co Hwy 30A at Big Redfish Lake with a new bridge. The new bridge will upgrade the drainage capacity on Co Hwy 30A at Big Redfish Lake which has seen substantial damage during past storm events.

By removing the existing culverts, this project will also provide an environmental benefit by allowing the lake to function in a more natural state. All engineering, design, and permitting is complete and utility relocations are scheduled to take place in early 2017. Construction of this project is currently scheduled for after Labor Day 2017. This project is being provided by a HMGP grant from FEMA with additional funding provided by the Walton County Board of County Commissioners.

Walton County
 

steel1man

Beach Fanatic
Jan 10, 2013
2,291
659
bids opened:
Bid Number: 017-027
Bid Title: BRIDGE MATERIAL FOR BIG REDFISH BRIDGE IMPROVEMENTS
Category: Public Works Road Construction
Status: Awarded
Additional Status Information: BCC awarded 08/08/2017
Bid Recipient: Conecuh Bridge & Engineering, Inc.
 

Kurt

Admin
Staff member
Oct 15, 2004
2,233
4,925
SoWal
mooncreek.com
HMGP BIG REDFISH LAKE BRIDGE IMPROVEMENTS

The Board of County Commissioners, "The County" is seeking competitive bids from qualified contractors to construct the following project.
This project consists of constructing a new 68 foot concrete two-span vehicular bridge on concrete pilings on County Road 30-A. The project also includes demolition of the existing double metal culvert on County Road 30-A along with earthwork activities and rip-rap to stabilize the slopes under the proposed bridge. The bridge approaches will constructed with a brick paver surface along with demolition and removal of the existing roadway each direction from the bridge approximately 150 linear feet with new limerock base and asphalt proposed.

LATE SUBMITTALS RECEIVED AFTER THE FOREMENTIONED DEADLINE DATE, EITHER BY MAIL, OR OTHERWISE, WILL NOT BE CONSIDERED AND RETURNED UNOPENED. THE TIME OF RECEIPT WILL BE DETERMINED BY THE TIME RECEIVED IN THE PURCHASING AGENT’S OFFICE. IT IS THE SOLE RESPONSIBILITY OF THE FIRM FOR ASSURING THAT THE SUBMITTAL IF RECEIVED IN THE PURCHASING OFFICE BY THE DESIGNATED DATE AND TIME. NO FAXED, ELECTRONIC OR ORAL SUBMITTAL WILL BE ACCEPTED.

BIDDER IS RESPONSIBLE FOR THE DELIVERY OF IT'S SUBMITTAL. SUBMITTALS RECEIVED AFTER THE SPECIFIED DAY AND TIME WILL NOT BE OPENED. THE PURCHASING DEPARTMENT IS CLOSED ON ALL FRIDAYS.

To be considered, contractor shall submit one original and three (3) copies of the submittal in a sealed envelope or package, clearly marked with the contractors' name and address, and the words "BIG REDFISH LAKE BRIDGE IMPROVEMENTS.

Bid closes on September 7, 2017 at 10:00AM (local time) and will be opened immediately thereafter.
 

Kurt

Admin
Staff member
Oct 15, 2004
2,233
4,925
SoWal
mooncreek.com
HMGP BIG REDFISH LAKE BRIDGE IMPROVEMENTS

The Board of County Commissioners, "The County" is seeking competitive bids from qualified contractors to construct the following project.

This project consists of constructing a new 68 foot concrete two-span vehicular bridge on concrete pilings on County Road 30-A. The project also includes demolition of the existing double metal culvert on County Road 30-A along with earthwork activities and rip-rap to stabilize the slopes under the proposed bridge. The bridge approaches will constructed with a brick paver surface along with demolition and removal of the existing roadway each direction from the bridge approximately 150 linear feet with new limerock base and asphalt proposed.

LATE SUBMITTALS RECEIVED AFTER THE FOREMENTIONED DEADLINE DATE, EITHER BY MAIL, OR OTHERWISE, WILL NOT BE CONSIDERED AND RETURNED UNOPENED. THE TIME OF RECEIPT WILL BE DETERMINED BY THE TIME RECEIVED IN THE PURCHASING AGENT’S OFFICE. IT IS THE SOLE RESPONSIBILITY OF THE FIRM FOR ASSURING THAT THE SUBMITTAL IF RECEIVED IN THE PURCHASING OFFICE BY THE DESIGNATED DATE AND TIME. NO FAXED, ELECTRONIC OR ORAL SUBMITTAL WILL BE ACCEPTED.

BIDDER IS RESPONSIBLE FOR THE DELIVERY OF IT'S SUBMITTAL. SUBMITTALS RECEIVED AFTER THE SPECIFIED DAY AND TIME WILL NOT BE OPENED. THE PURCHASING DEPARTMENT IS CLOSED ON ALL FRIDAYS.

To be considered, contractor shall submit one original and three (3) copies of the submittal in a sealed envelope or package, clearly marked with the contractors' name and address, and the words "BIG REDFISH LAKE BRIDGE IMPROVEMENTS.

Bid closes on September 7 28, 2017 at 10:00AM (local time) and will be opened immediately thereafter.
 

Kurt

Admin
Staff member
Oct 15, 2004
2,233
4,925
SoWal
mooncreek.com
Big Redfish Lake Bridge Closing – The bids have been received and will be considered for award at the next BCC meeting on Oct 10th.

There is an alternate price to be considered by the board to complete the project in 60 days as opposed to the 90 day base bid.

Road will be closed starting October 23rd at the bridge site. Multi-use path will be closed starting Oct 16th for utility relocates.
 

steel1man

Beach Fanatic
Jan 10, 2013
2,291
659
One bid was for 60 days
More where for 90
Who knows who won....first week limited work....6" gas line welded in line sitting on 30A.
 

Jenksy

Beach Fanatic
Oct 25, 2012
799
617
Something needs to be done about the detour intersections on 98 - traffic is backed up on grayton rd going north. Need to change the light frequency or get a traffic cop.
 