Update
Left and right turn lanes will also be added to CR 395 onto Scenic 30A Fall 2017.
Fall 2018 will see the addition of a right turn lane for westbound traffic on Scenic 30A onto CR 395, and a left turn lane for eastbound traffic on Scenic 30A onto CR 395. A median will be added on CR 395. A stoplight will be installed and with red/green arrows for all turn lanes.
No plans for moving the bike path to south side as some have requested, but the bike lane will be forced to use signal buttons to integrate with traffic.
Left and right turn lanes will also be added to CR 395 onto Scenic 30A Fall 2017.
Fall 2018 will see the addition of a right turn lane for westbound traffic on Scenic 30A onto CR 395, and a left turn lane for eastbound traffic on Scenic 30A onto CR 395. A median will be added on CR 395. A stoplight will be installed and with red/green arrows for all turn lanes.
No plans for moving the bike path to south side as some have requested, but the bike lane will be forced to use signal buttons to integrate with traffic.