Scenic 30a Open - Draper Lake Bridge Construction Complete

Discussion in 'All About SoWal' started by Kurt Lischka, Aug 24, 2015.

  1. Leader of the Banned

    Leader of the Banned Beach Fanatic

    Joined:
    Apr 23, 2013
    Messages:
    3,378
    Likes Received:
    609
    It's permanent. Sorry. [not sorry]
     
  2. steel1man

    steel1man Beach Fanatic

    Joined:
    Jan 10, 2013
    Messages:
    2,218
    Likes Received:
    467
    Please note that the temporary signal located at the C.R. 83/U.S. 98 intersection will be switched to “Flash Mode” on March 2, 2016, and will remain so until Big Redfish Lake Bridge is constructed. At that time the signal will be allowed to operate for maintenance of traffic during the construction activities. We are pleased to report the Draper Lake Bridge Project has opened ahead of schedule.

    The Florida Department of Transportation will conduct a signal warrant analysis in the near future to determine if a permanent signal is warranted at the U.S. 98/C.R. 83 intersection.
     
  3. Teresa

    Teresa SoWal Guide Staff Member

    Joined:
    Nov 15, 2004
    Messages:
    26,485
    Likes Received:
    2,664
    Location:
    South Walton, FL
    Flash mode is better than none. Seems like full mode would be a good idea for spring break and summer season. Dangerous spot even with bridge open.
     
    • Like Like x 1
    • Agree Agree x 1
    • List
  4. seabythegrove

    seabythegrove Beach Fanatic

    Joined:
    Nov 16, 2012
    Messages:
    477
    Likes Received:
    104
    The Florida Department of Transportation will conduct a signal warrant analysis in the near future to determine if a permanent signal is warranted at the U.S. 98/C.R. 83 intersection.
     
  5. Leader of the Banned

    Leader of the Banned Beach Fanatic

    Joined:
    Apr 23, 2013
    Messages:
    3,378
    Likes Received:
    609
    As a rule, I prefer more lights but with higher speed limits and good merging lanes.
     

Share This Page