Not likely an issue where they would be placed. They would be far enough offshore and in deep enough water, but modeling would be performed before a permit was issued. The proposal/ideas for SoWal don't appear to be a problem, but they will be reviewed for sure. I was speaking more on attached structures like groins/jetties, and breakwaters that are typically closer inshore.