What is the basis for the six month closure? Did this come from the meeting or is it your estimate?
From the estimate given at the BCC meeting. I'm betting longer though.
Will pedestrians and cyclists be able to cross through? I guess technically they can (and do) right now but I guess technically it's also illegal/discouraged.
They are looking at fixing the pedestrian bridge asap as a separate project from the roadway fix.
What is it about the bridge that needs fixing, or do they just need to finish inspecting it to make sure it's safe? Did they actually find a problem with it?